The full application, running on sample data. Open it in a new tab and explore at your own pace. Water and electricity use, park wide and per ride, checked against what the day justified. Municipal water restrictions and water chemistry standards, entered once and checked automatically. Leaks, spikes, unusual usage, equipment wear and chemistry drift, raised before a limit is crossed. Spares, work orders and inspections closed out before the busiest weeks. Tied to real usage data, with one click inspection packs and locked records. A phone page for staff that lands straight in the maintenance queue. Every screen below is the real product with the demo parks. Click any one to zoom, then use the arrows or swipe to move through them. Pages from the sample Monthly Sustainability Summary. The whole report opens from the View Sample Report button at the top of this page.
Most parks know their utility bill. Very few know which ride, on which day, at which hour, drove it. Water Park Flow closes that gap with continuous measurement instead of end of month surprises. The result is an operation that can prove its compliance, spot waste early, keep an inspection ready record without extra work, and make efficiency a number on a screen rather than a hope.
Try Water Park Flow Yourself
What It Does, In Plain Terms
Live View
Compliance Checks
Early Warnings
Peak Season Readiness
Maintenance And Compliance Log
Report A Problem
Inside The App






















Inside The PDF Reports






Who It Is For
Water Park Flow is built for water park operators, facility managers, and sustainability leads who are accountable for utility costs, water quality and municipal compliance. It fits a single park or a portfolio, and it is designed to be read by the people who run the operation day to day, not only by engineers. Lifeguards and ride attendants get their own simple page for reporting problems, and inspectors get one document with every record they ask for.
How It Works
Usage data from meters and control systems feeds the dashboard continuously. Each ride and zone gets its own profile. Municipal restriction rules and water chemistry standards are entered once and checked automatically. The Looking Ahead module watches for patterns that do not match expected behaviour and raises them early, with the context needed to act. Every record is kept as it was entered, by whom and when, so the log stands up to an inspection.
Software Application Features
- A live view of water and electricity use, park wide and per ride
- Automatic compliance checks against local water restrictions and water chemistry standards
- Early warnings on leaks, spikes, unusual usage, equipment wear and chemistry drift
- Peak season readiness, so spares, work orders and inspections are closed out before the busiest weeks
- A maintenance and compliance log tied to real usage data, with one click inspection packs
- A phone page for staff to report problems straight into the maintenance queue
- Reports ready to share, on the schedule you choose
Dashboard and Status Board
- One dashboard for every park in the company, each with a status board for Compliance, Efficiency and Problems, a green, amber or red level and a plain reason for each.
- Full park cards with the day’s weather from the forecast, water and electricity against the model, the scorecard grade, a 14 day water chart, the open alerts, and a Peak season marker when the park is in its busiest months.
- Month to date water, electricity, cost, carbon, recycled water and guests for every park and for the whole company, each against the same period last year.
- Sustainability Scorecard: an A to E grade per park on recycled water rate, water per guest, energy per guest, carbon per guest, permit compliance, water quality and equipment condition, with the trend on each.
- Path to Net Zero: the straight path from each park’s baseline year to its target year against what it has actually emitted, with the gap, the reduction since baseline and the cut needed each year.
- Looking Ahead: the predictive analysis, listing what is going to become a problem before it does.
Water and Energy Tracking
- Per ride and whole park tracking of fresh water, electricity, utility cost and carbon.
- A physical model that works out what each ride should have used from the weather, attendance, pump sizes and operating hours, so every reading is checked against what the day justified.
- Evaporation, splash out, backwash, rain gain and recycled water rate for every ride.
- Pump energy from rated power, load factor, variable speed drives and idle share, with peak demand and demand charges.
- Daily weather from Open Meteo with a year of history, or a synthetic climate model for offline use.
- Utility rates per park with tiers, demand limits and sewer charges, in the park’s own currency and units.
Alerts and Predictive Analysis
- Thirty six alert types covering leaks, pump wear, filter pressure, overnight running, suspect readings, permit and daily limit projections, demand limits, equipment age, water chemistry, test frequency, checklists, inspections, work orders, assets, backwash, chemical stock and spare parts.
- Advance warnings before a limit is crossed, not after.
- Looking Ahead watch items from fifteen analysis rules: water and electricity climbing toward the problem line, pump vibration and bearing temperature heading for the alarm zone, filters loading faster or not coming clean, chemistry drifting toward a limit, chemical stock running out before a delivery can land, the permit crossing date, hot spells in the forecast, a growing work order backlog, assets reaching end of life, inspections bunching up, daily checks being missed, peak season readiness, UV and ozone lamps and validations, and heavy bather load days ahead.
- Each watch item carries the evidence figures, when it matters, a confidence level and what to do.
- A pump that is heading for the alarm line with no spare on the shelf and a lead time longer than the days left becomes an Act Now item. In peak season the spare has to land a week early.
- Peak season months per park. Six weeks before peak, critical spares below minimum, high priority ride work orders, inspections falling in peak and poor rated critical assets are gathered into one readiness item. During peak, a critical spare with a long lead time is red while one is still on the shelf, and an overdue ride work order goes red after a week.
- Bather load: a day ahead expected well above the park’s usual weekday or weekend crowd prompts a halved test interval and a secondary disinfection check.
- One click from any alert to a work order.
Compliance
- Municipal water permit tracking with daily and monthly limits, month to date use, the projected month end and the date the limit would be crossed.
- Water chemistry standards profile per park: CDC Model Aquatic Health Code, British Columbia Pool Regulation, Ontario Regulation 565, Nova Scotia Aquatic Guidelines or custom, with every limit editable.
- Water quality log for free and combined chlorine, bromine, pH, alkalinity, calcium hardness, cyanuric acid and water temperature per pool, checked against the profile as you save, with excursions, actions taken and test coverage.
- Regulatory compliance register for health inspections, ride permits and annual inspections (ASTM F770, CSA Z267), drain cover certification, backflow tests, generator tests, electrical and fire inspections, chemical storage, insurance and operator certification, with overdue and due soon alerts.
- Daily safety checklists: pre opening ride checks, closing round, plant room round, structural walk, safety equipment, generator test, wave machine and splash pad checks, kept with the person and the date. A failed item opens a work order.
- Crypto Response checklist on every park, following the CDC fecal incident response steps: closure, pH, hyperchlorination level and contact time, backwash, secondary disinfection check, reopening values and notification.
- Inspection Readiness Pack: one button builds a numbered PDF of every record an inspector asks for over a chosen period: the water chemistry log with excursions and actions, daily and periodic checks with who signed them, the backwash log, chemical deliveries and stock takes, UV and ozone systems, the compliance register, safety work orders and incident response records. It records who prepared it and when.
- Record locking: preparing a pack locks every water test, checklist run, backwash, chemical movement and work order inside the period. Locked entries cannot be changed or deleted, only annotated with a dated note kept alongside the original, so the log shows it was not tidied up after the fact.
Maintenance
- Work orders with priority, status, assignment, parts and labour cost, downtime and resolution.
- Asset register for pumps, drives, valves, panels, generators, lighting, HVAC, safety equipment, ride equipment and structures, with condition, warranty, expected life and inspection intervals.
- Corrosion environment on every asset (mild, damp, chemical, severe) that shortens its inspection interval, so a pump in chlorine vapour is looked at more often than one in a dry room. An overdue inspection on a critical asset in a harsh environment is red.
- Spare parts register with minimums, lead times, unit cost, storage location, the assets each part fits, deliveries, use, stock takes and write offs. Parts used on a work order come off stock and add their cost to the job.
- UV and ozone systems per pool with lamp life and hours, intensity, ozone residual and dose validation dates, with Reading, Lamp change and Validated actions and warnings when lamps near the end of life or a validation falls due.
- Filters and backwash log with differential pressure, water to waste and pressure based backwash alerts.
- Chemical inventory with deliveries, daily use, stock takes, days of stock and reorder alerts.
- Condition readings from pumps (vibration, bearing and motor temperature) and indoor humidity, with alarm zone alerts.
- Report a Problem: lifeguards, ride attendants and cleaners get one phone friendly page. Pick the ride or area, describe the problem, add a photo, mark it urgent, send. It lands in the maintenance queue as a work order with their name on it, and they can see when it is picked up and fixed. The park dashboard counts reports waiting.
Reports
- Fourteen PDF report types for engineers, executives and inspectors: Monthly Sustainability Summary, Season Outlook, One Page Board Summary, Capital Proposal, Ride Water and Energy Profile, Compliance Log, Evaporation Analysis, Forecast Accuracy, Annual Impact, Water Quality Log, Maintenance Summary, Asset Register and Lifecycle, Regulatory Compliance Status, and the Inspection Readiness Pack.
- Generated on demand in the browser or emailed on a schedule.
- Written summaries, the Looking Ahead watch items and the Path to Net Zero chart inside the executive reports.
- Every report carries its formulas and assumptions on the last page.
Retrofit Scenarios
- Ten common upgrades with capex, savings and payback: variable frequency drives, activated play features, low flow ride design, splash containment risers, overnight circulation setback, overnight pool covers, LED lighting, staggered pump starts, dehumidifier heat recovery and pressure based backwash.
- Savings are not estimates. Each scenario reruns the park’s own last 365 days of weather and attendance through the model with the upgrade switched on.
Data Intake
- Manual entry forms for meter readings, tests and checks.
- Automated intake through an API key per source, accepting JSON in any shape or CSV, with a raw inbox and field mapping so any machine format can be connected without losing data.
- CSV upload.
- The daily job catches up on its own after a missed run and repairs any gaps inside the last 45 days, so the record stays continuous.
Platform
- Multi park and multi company with five roles: system admin, account admin, park manager, problem reporter and demo viewer.
- Park, ride, location, rate, permit and peak season settings editable in the app, with photo uploads for parks and rides.
- Backup and Restore: one dated zip of the whole database and every uploaded photo, taken from the app, downloadable, and restorable from the list or from an uploaded file. A safety backup is taken before every restore.
- Light and dark themes, phone friendly layout and an audit trail of every change.
- Plain PHP and MySQL, installs on ordinary web hosting with a browser installer and a single daily scheduled job. No special server needed.
- Demo parks with realistic history so every feature can be seen working on day one, including an example Modbus source on the Sunridge demo park.
How Water Park Flow Is Sold
Water Park Flow is quoted for each park or group after a short consultation, so the setup, the data sources and the support level match your operation. Start with a Request Quote and we will come back with questions and a clear next step.
Want this for your park?
Tell us about your facility and we will show you what tracking would look like for you, then quote it after a short consultation.
Request Quote
